Our cabin – or is it our house by now? – is still changing year by year.
This year our bathroom no. 2 was finally finished and can now be used at last. It’s much better when we’re complete, and it makes things a lot more relaxed. 😉
Next on the plan is renewing and roofing our deck (porch, terrace, Terrasse), which has taken quite a beating over the years. Back then we chose the cheapest wood – but even staining, oil and other treatments couldn’t stop it from weathering. Over time it also became clear that it won’t work without a roof, since snow, ice and thawing weather also damage the cabin.
Also, it would be nice to move the fish processing room upstairs onto one level too, but that’s not very realistic yet. 💰💰💰
So: let’s get to it

2025 started with water damage in the bathroom – and of course in the wall to the bedroom. So wall out, insulation out, replaced the cracked hose and put everything back in. Done. 😉 The kids and Christian also quickly fixed the covered part of the roof. They also replaced the remaining rotten posts under and next to our cabin with concrete posts – THANK YOU. Otherwise, everything as always – our second home is simply one of a kind, even if it sometimes gets a bit “fussy”.
Now our cabin has survived another winter (hopefully) and is waiting for 22/06/2026 😊

Cabin 2024
Forgotten feed for the wild birds had been taken advantage of by the “Alaska mice”, and they settled in our shed over the winter. Looks and “smell” can’t be described here 🙈 – With a bigger clean-up, sealing the “entry points” and good airing out, the damage could be fixed.
Inside the cabin itself, work continued in Bathroom 2: the floor was laid and the ceiling installed, and the plumbing connections were started.
Planning for 2025 is in progress



History of our cabin - which has now become more of a house - over time.
A chronological photo series from 2000 to today
For earlier years, please scroll down 😊
Severe damage after 2 years of COVID shutdown - roof leaking, water intrusion in bedroom and shed
Support posts had to be replaced - most of our roof was finished with sheet metal.
Trees around our cabin were cut down and our deck is getting a new coat of paint


































































































Interior fit-out of the addition continues
Boat/carport had to be dismantled - collapse in winter




































Our addition gets a coat of paint (thanks Steven) and the interior build-out continues.
There’s a shelter for our boat and there’s the Suburban (thanks Jeff)
















































































Interior addition - Completion Bedroom 2 - Electrical connections and siding on the base cabin completed




































cabin-addition - Start of the interior build-out - extension of our "living room"
















































































Project 2014 - The rear conversion is turning out, as mentioned, a bit bigger than planned - Boss is back on board














































































As of September 2013 - Interior and exterior photos




























Family project is underway.
My "extension" looked a bit smaller on paper than it actually ended up being.
The foundation has been laid, and in the coming years it should continue - if finances allow.
Thanks to Klaus, Benni and Alex for the hands-on help
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
A quiet year, only the floors were renewed and "rearranged"
Oh yes: and we finally got natural gas - hauling the heavy gas bottles is finally over




















A quiet year, only the floors were renewed and "rearranged"
Oh yes: and we finally got natural gas - hauling the heavy gas cylinders is finally over






























The kitchen build-out and furnishing - Thank you Monika and Robin




















A new front door and a bit of paint




















Work continued on the exterior cladding and - thanks to the World Cup - there was a satellite dish and TV




















Veranda - Terrace - Deck - Porch . . .or whatever it’s called




















The fish-cleaning corner is taking shape, fly- and bear-proof (for insiders), and the start of the exterior cladding


















The interior fit-out, cabin insulation and shutters for winter safety




















Adding a bedroom - conversion work on the cabin. Thanks Volker




















Cabin expansion, a storage area is being created and, as always, Volker is part of it. Thanks